Alert · Acknowledge · Handover

Factory floor communication software so the next shift inherits facts, not rumours

A line stop told in a corridor is lost by the next shift. Auribises builds factory floor communication: alert, acknowledge, and a handover the incoming supervisor can read.

  • Line alerts
  • Acknowledge
  • Handover

Response views

Alerts acknowledged in 15 min %

Illustrative week

Mon
Tue
Wed
Thu

Alert mix

Illustrative mix

  • Material — 40%
  • Quality — 30%
  • Machine — 30%
IssueLine
AlertSent
AckOwner
CloseNoted

Issue-to-handover flowchart

Issue

Line

Alert

Sent

Ack

Owner

Action

Done

Handover

Next

1

Raise it from the line

Station, what stopped, and when — not a shout across the bay.

2

Alert the person who can act

Supervisor or maintenance, with the line named.

3

Acknowledge so the floor knows it was seen

An owner and a time, visible at the station.

4

Hand it to the next shift

Open items are the start of the handover, not a verbal aside.

Factory floor communication, separate from the production plan

Factory floor communication software is how a line tells a supervisor that something stopped, and how that supervisor tells the next shift. It is not a full production system. Auribises builds the alert, the acknowledgement, and the handover so open issues survive a shift change.

Output, jobs, and materials stay in production management. Accounts stay in manufacturing CRM. Defects can move to quality, and machine work to maintenance.

Floor communication features

Line and station

Where it happened.

Alert

The right role, immediately.

Acknowledgement

Seen, with a time.

Shift handover

Open items, written down.

Maintenance flag

Machine issues leave the bay.

History

What this station raised this week.

Floor communication problems we solve

01

Problem: Stops are shouted and forgotten

Solution: An alert with a station and a timestamp.

02

Problem: Nobody knows if a supervisor saw it

Solution: Acknowledgement is part of the record.

03

Problem: The next shift starts blind

Solution: Open alerts are the handover.

04

Problem: Maintenance hears about it at lunch

Solution: A machine alert routes to maintenance, not only the bay.

How we build factory floor communication

Corridor talk vs floor communication

NeedVerbal handoverAuribises floor comms
Line stopA shoutStation and time
Seen by supervisorUnclearAcknowledged
Next shiftWhatever was rememberedOpen list
MaintenanceTold laterRouted
HistoryNoneOn the station

Factory floor FAQs

It records a line issue, alerts the person who should act, requires an acknowledgement, and carries open items into the next shift handover.

No. Production planning and job tracking stay in production management. This product is the message between the floor and the people who must respond.

A station can raise a typed alert that a supervisor must acknowledge. Physical andon hardware can be added only if you scope it.

Open items remain until someone closes them, so the incoming shift does not depend on a verbal handover.

Supervisors can acknowledge from a phone. The record stays on the station either way.

Share how many lines and shifts you run, and where a stop is reported today.

The line speaks. Someone answers. The next shift can read it.

Related

Lead